Hi everyone,

I'm in the early stages of planning an Accessory Dwelling Unit (ADU) on my property in Sacramento, California, and I've hit a bit of a snag regarding utility meters. My lot is about 6,500 square feet, and I'm trying to keep the project within a reasonable budget. I've read through some of the city's guidelines but am still unclear about whether I need to install a separate utility meter for the ADU.

From what I understand, having a separate meter could mean additional costs upfront, but it might simplify things for potential future tenants. I’d love some advice from anyone who's gone through this.

Here are my main concerns:
1. Is a separate utility meter a requirement for an ADU in Sacramento, or can I just extend the utilities from my main house?
2. What are the cost implications of installing a separate meter versus using the existing one? I’m trying to figure out if the long-term benefits are worth the initial expense.
3. How does having one versus two meters impact renting out the ADU in terms of utility billing?
4. Are there any specific regulations or incentives in Sacramento that I should be aware of which could influence this decision?

I’d really appreciate any insights or experiences you could share. Thanks in advance for your help!

1 Answer

David Chen
October 18, 2025 at 12:09 PM
Hello!

Embarking on an ADU project is an exciting venture, and I’m glad to see you’re thinking through the utility meter question carefully. Let’s break down your concerns and provide actionable insights to help guide your decision.

### 1. Is a Separate Utility Meter Required for an ADU in Sacramento?

In Sacramento, you are not required to install a separate utility meter for an ADU. According to California state law, specifically under SB-13 and AB-68, local jurisdictions like Sacramento cannot mandate separate utility connections or meters as a condition for ADU approval. This means you have the option to extend utilities from your main house to the ADU without installing a separate meter.

**Consideration:** While not required, opting for a separate meter could simplify utility billing if you plan to rent out the ADU, as it allows tenants to manage their own utility usage. However, this comes with added costs and considerations.

### 2. Cost Implications of Installing a Separate Meter vs. Using the Existing One

**Using Existing Meter:**
- **Cost:** Typically, extending existing utilities (water, electricity, gas) to your ADU could cost between $3,000 to $8,000 depending on the distance and complexity of the connections.
- **Pros:** Lower upfront costs, simpler installation process.
- **Cons:** You’ll need to manage utility billing and consumption if renting to tenants, which might require sub-metering solutions.

**Installing a Separate Meter:**
- **Cost:** Installing separate utility meters can be more expensive. For electricity, expect costs around $1,500 to $3,000 for the meter installation alone. Water and gas meters can add another $2,000 to $5,000 each, depending on the utility company’s policies and the distance from the main lines.
- **Pros:** Easier utility management for tenants, potentially higher appeal to renters.
- **Cons:** Higher initial costs, longer installation timeline, possible need for additional permits.

### 3. Impact on Renting Out the ADU

With a single meter, you’ll need to incorporate utility costs into the rent or use sub-metering for tenant billing. Sub-meters can cost between $200 to $500 each and provide a way to track usage more precisely.

With separate meters, tenants can pay directly to the utility companies, making it more transparent and potentially more attractive to renters who prefer to manage their own bills.

### 4. Sacramento-Specific Regulations and Incentives

Sacramento has been supportive of ADU developments as part of its housing strategy. Here are some key points:
- **Permit Fees and Timelines:** Sacramento aims to streamline the permitting process for ADUs, and recent state laws like AB-68 and SB-9 have mandated quicker processing times (60 days once a complete application is submitted). Permit fees for ADUs can range from $1,000 to $3,000, depending on size and complexity.
- **Incentives:** Check for local incentives such as fee waivers or reductions. Sacramento has offered such incentives to encourage ADU construction.

### Tips and Warnings

- **Consult with Utility Providers Early:** Engage with Sacramento Municipal Utility District (SMUD) and local water providers early in your planning to understand specific requirements and timelines.
- **Check Zoning and Building Requirements:** Even though state laws are in place, ensure that your project complies with local zoning ordinances and building codes.
- **Consider Future Needs:** If you’re considering selling your property in the future, having separate meters might make the property more appealing.

### Next Steps

1. **Consult with a Local ADU Specialist:** Given the complexities, consider consulting with a local ADU expert or architect who can assess your specific property and provide tailored advice.
2. **Engage with Contractors:** Obtain quotes from licensed contractors for both utility extension and separate meter installation to understand the full cost implications.
3. **Visit Local Government Offices:** Sacramento’s planning department can offer specific information and guidance on ADU regulations and any local incentives available.

### Resources

- **Sacramento County Planning and Environmental Review:** For the latest on local ADU regulations.
- **SMUD and Local Water Utility:** For detailed utility connection information.
- **California Department of Housing and Community Development:** Offers comprehensive guides on state ADU laws.

By weighing the costs and benefits, along with considering your long-term plans for the property, you’ll be in a strong position to make the best decision for your ADU project. Good luck, and feel free to reach out with more questions as you progress!
Didn't find what you're looking for?

Need help with ADU plans, permits, or finding contractors? Our experts are here to guide you through the entire process.

Book Free Call
or call: (323) 591-3717
Community Answers
Share Your Knowledge

Help the ADU community by sharing your experience, insights, or professional expertise.

Please provide helpful, detailed answers based on your experience with ADUs.
Required but never displayed publicly or shared.
CAPTCHA
Your contribution helps thousands of homeowners exploring ADU options

Ready to Start Your ADU Project?

Get a personalized quote based on your specific needs and location. Our experts will guide you through every step of the process.

Get Instant Quote
Free consultation included • No obligation

Types of ADUs in Sacramento, CA

Understanding the different types of Accessory Dwelling Units can help you choose the best option for your property and needs.

Detached ADU

A separate, standalone structure built on your property. Offers maximum privacy and flexibility for tenants.

  • Complete privacy
  • Custom design options
  • Higher rental income potential
Attached ADU

An addition to your existing home with a separate entrance. Cost-effective option with shared utilities.

  • Lower construction costs
  • Shared utility connections
  • Family-friendly proximity
Garage Conversion

Convert existing garage space into a livable unit. Most cost-effective ADU option with fastest approval.

  • Lowest construction cost
  • Faster permitting
  • Uses existing structure
JADU

Junior ADU created within the existing home. Maximum 500 sq ft with efficiency kitchen and shared utilities.

  • Minimal construction
  • No parking requirement
  • Perfect for family use
Upper Floor ADU

Add a second story or convert existing upper floor space. Maximizes property value and rental potential.

  • Premium rental rates
  • Enhanced privacy
  • Great city views
Basement ADU

Convert basement or lower level into living space. Great option for properties with existing below-grade areas.

  • Uses existing space
  • Natural temperature control
  • Sound isolation

ADU Cost Guide for Sacramento, CA

Understanding ADU costs helps you budget effectively and make informed decisions about your project. Costs vary based on size, complexity, and local factors.

ADU Type Size Range Cost Range Timeline Best For
Garage Conversion 400-800 sq ft $80K - $150K 3-6 months Budget-conscious homeowners
JADU Up to 500 sq ft $50K - $100K 2-4 months Family use, minimal disruption
Attached ADU 600-1,000 sq ft $120K - $200K 4-8 months Shared utilities, family proximity
Detached ADU 600-1,200 sq ft $150K - $300K 6-12 months Maximum rental income
Two-Story ADU 800-1,500 sq ft $200K - $400K 8-15 months Maximizing property value
Cost Factors to Consider
  • Site Preparation: $5K - $25K
  • Permits & Fees: $3K - $15K
  • Utility Connections: $5K - $20K
  • Finish Level: $10K - $50K variance
  • Landscaping: $2K - $10K
Potential ROI
  • Rental Income: $1,500 - $4,000/month
  • Property Value Increase: 20-30%
  • Payback Period: 8-15 years
  • Tax Benefits: Depreciation allowances
  • Equity Growth: Long-term appreciation
Get Your Personalized Cost Estimate

These are general ranges. Your actual costs may vary based on specific site conditions, design choices, and local market factors in Sacramento.

Get Detailed Quote

Why Build an ADU in Sacramento?

Financial Benefits
Rental Income: Generate $18,000-$48,000 annually
Property Value: Increase home value by 20-30%
Tax Benefits: Depreciation and expense deductions
Investment: Strong ROI in California markets
Lifestyle Benefits
Multigenerational Living: Keep family close while maintaining privacy
Home Office: Create dedicated workspace or studio
Guest Space: Comfortable accommodations for visitors
Sustainability: Increase housing density efficiently

Popular ADU Floor Plans

Explore our most popular ADU designs that work well in Sacramento, CA. These professionally designed floor plans optimize space and functionality while meeting local building requirements.

Cascade ADU Floor Plan - 2 Bedroom, 2 Bathroom
2 Bed 2 Bath 1,200 sq ft
The Cascade

Spacious 2-bedroom design perfect for families. Features open living area, full kitchen, and two full bathrooms with optimal privacy.

Open floor plan
Master suite
Laundry room
Summit ADU Floor Plan - 2 Bedroom, 2 Bathroom
2 Bed 2 Bath 950 sq ft
The Summit

Efficient 2-bedroom layout maximizing every square foot. Great for narrow lots with smart storage solutions throughout.

Compact design
Pantry storage
Two full baths
Brookside ADU Floor Plan - 2 Bedroom, 2 Bathroom
2 Bed 2 Bath 1,400 sq ft
The Brookside

Luxurious 2-bedroom design with premium features. Includes master suite, guest bedroom, and spacious living areas.

Large living room
Walk-in closets
Full kitchen island
Sequoia ADU Floor Plan - 3 Bedroom, 2 Bathroom
3 Bed 2 Bath 1,100 sq ft
The Sequoia

Unique 3-bedroom configuration perfect for larger families. Features dual bathrooms and smart space utilization.

Three bedrooms
Laundry room
Multiple closets
Crestline ADU Floor Plan - 3 Bedroom, 2 Bathroom
3 Bed 2 Bath 1,500 sq ft
The Crestline

Premium 3-bedroom layout with maximum comfort. Features spacious bedrooms, walk-in closets, and luxury finishes.

Primary suite
Pantry space
Open concept
Ready to Explore More ADU Designs?

Browse our complete collection of ADU floor plans with detailed specifications, 3D renderings, and customization options.

View All Floor Plans

Types of ADUs in Sacramento, CA

Understanding the different types of Accessory Dwelling Units available in Sacramento, CA can help you choose the best option for your property and budget.

Detached ADU

A standalone structure separate from the main house. Offers maximum privacy and flexibility.

  • Maximum privacy
  • Flexible design options
  • Higher rental income potential
Garage Conversion

Converting an existing garage into a living space. Most cost-effective option.

  • Lower construction costs
  • Faster permitting process
  • Existing utilities nearby
Attached ADU

An addition to the existing house with separate entrance. Balances cost and privacy.

  • Shared utilities
  • Moderate construction costs
  • Easy maintenance access
Ready to Start Your ADU Project?

Get a personalized quote and expert guidance for your Sacramento ADU project.

Get Instant Quote

ADU Cost Guide for Sacramento, CA

Understanding ADU costs helps you budget effectively and make informed decisions about your project in Sacramento, CA.

ADU Type Size Range Cost Range Cost per Sq Ft Timeline
Garage Conversion 400-800 sq ft $80,000 - $150,000 $200 - $250 3-6 months
Attached ADU 500-1,200 sq ft $150,000 - $300,000 $250 - $350 6-9 months
Detached ADU 600-1,200 sq ft $200,000 - $400,000 $300 - $450 8-12 months
Prefab ADU 400-1,000 sq ft $120,000 - $250,000 $250 - $350 4-8 months
JADU (Junior ADU) Up to 500 sq ft $50,000 - $120,000 $150 - $300 2-4 months
Cost Factors to Consider:
  • Site preparation and utilities
  • Permits and plan review fees
  • Foundation and structural work
  • Finishes and appliances
  • Landscaping and driveway
Ways to Save Money:
  • Choose garage conversion over new build
  • Use prefab or modular construction
  • Keep design simple and efficient
  • Bundle with main house renovations
  • Work with experienced ADU builders
Get Your Personalized ADU Cost Estimate

Our experts will provide a detailed cost breakdown for your specific Sacramento property.

Get Free Cost Estimate

Complete Guide to Construction & Building ADUs in Sacramento, CA

Understanding Construction & Building for ADU Projects

ADU development in Sacramento, CA involves numerous considerations specific to construction & building. Understanding local requirements, best practices, and potential challenges helps ensure project success.

Each ADU project is unique, with specific circumstances that influence design, permitting, and construction decisions. Professional guidance helps navigate these complexities and achieve optimal outcomes.

The GatherADU team has extensive experience with construction & building aspects of ADU development and can provide expert assistance throughout your project.

Construction & Building Requirements in Sacramento, CA

Local regulations in Sacramento, CA have specific requirements that affect ADU development. Understanding these local nuances is crucial for project success and compliance.

Sacramento has 19 ADU-related questions in our database, indicating active development interest in your area. This local activity suggests growing expertise among contractors, architects, and city officials familiar with ADU projects.

Common considerations for Sacramento include local architectural standards, historical district requirements if applicable, utility connection procedures, and neighborhood-specific zoning overlays that may affect your project.

Expert Insights on Construction & Building

The GatherADU team has helped hundreds of homeowners navigate construction & building challenges successfully. Our experience reveals common patterns, effective strategies, and potential pitfalls to avoid.

Professional consultation early in your project can prevent costly mistakes and delays. We've seen how proper planning in the construction & building phase saves both time and money throughout the entire ADU development process.

Our database contains 70 questions related to Construction & Building, with 70 expert answers providing comprehensive guidance for homeowners facing similar challenges.

Ready to Move Forward with Your ADU Project?

Don't let construction & building challenges delay your ADU dreams. Our experts can provide personalized guidance specific to your situation in Sacramento, CA.

More Construction & Building Questions & Answers

Explore additional construction & building questions from our community to gain deeper insights into ADU development challenges and solutions.

Do I need a separate utility meter for my Sunnyvale ADU?
Sunnyvale, CA 1 answers

Hi everyone, I’m in the planning stages of adding an ADU to my property in Sunnyvale, CA, and I’ve ...

October 22, 2025
What are the inspection requirements during ADU construction in San Jose?
San Jose, CA 1 answers

Hello everyone, I'm in the early stages of planning an ADU (Accessory Dwelling Unit) on my property...

October 22, 2025
How long does ADU construction take in Pomona?
Pomona, CA 1 answers

Hello everyone, I'm considering building an ADU on my property in Pomona, CA, and I'm trying to get...

October 22, 2025
What foundation is required for ADUs in Glendale?
Glendale, CA 1 answers

Hi everyone, I'm a homeowner in Glendale, CA, looking into building an Accessory Dwelling Unit (ADU...

October 22, 2025
Best ADU contractors in Santa Clarita?
Santa Clarita, CA 1 answers

Hi everyone, I'm a homeowner in Santa Clarita, CA, and I've been seriously considering adding an AD...

October 22, 2025
Can I convert my garage into an ADU in Hayward?
Hayward, CA 1 answers

Hi everyone, I'm considering converting my two-car garage into an ADU here in Hayward, CA, and woul...

October 22, 2025
What foundation is required for ADUs in Bakersfield?
Bakersfield, CA 1 answers

Hello everyone, I'm in the early stages of planning to add an Accessory Dwelling Unit (ADU) to my p...

October 22, 2025
What are the inspection requirements during ADU construction in Anaheim?
Anaheim, CA 1 answers

Hello everyone, I'm in the process of planning an ADU on my property in Anaheim, CA, and I could re...

October 22, 2025

ADU Questions from Sacramento, CA

Discover how other homeowners in Sacramento, CA are approaching their ADU projects. Local insights can provide valuable context for your own planning.

Do I need to replace parking if I convert my garage in Sacramento?
Garage Conversion 1 answers

Hi everyone, I'm a homeowner in Sacramento, and I'm seriously considering converting my detached tw...

October 22, 2025
How to handle utility connections for an ADU in Sacramento?
Construction & Building 1 answers

Hi everyone, I'm planning to build an ADU on my property in Sacramento, and I'm a bit confused abou...

October 22, 2025
What's the process for converting a detached garage in Sacramento?
Garage Conversion 1 answers

Hi everyone, I'm seriously considering converting my detached garage into an ADU here in Sacramento...

October 22, 2025
Can I add a second story to my garage for an ADU in Sacramento?
Garage Conversion 1 answers

Hey everyone, I'm a homeowner in Sacramento, and I've been considering adding a second story to my ...

October 22, 2025
Can I build two units under SB-9 in Sacramento?
SB-9 (Lot Splits) 1 answers

Hello everyone, I'm considering taking advantage of California's SB-9 legislation to potentially bu...

October 22, 2025
What's the ROI on an ADU in Sacramento for rental income?
Cost & Budget 1 answers

Hello everyone, I've been considering building an ADU (Accessory Dwelling Unit) on my property here...

October 22, 2025

Related ADU Questions

These questions share similar topics or locations and may provide additional insights for your ADU project.

Do I need a separate utility meter for my Sunnyvale ADU?
Construction & Building Sunnyvale, CA
1 answers Oct 22, 2025
What are the inspection requirements during ADU construction in San Jose?
Construction & Building San Jose, CA
1 answers Oct 22, 2025
How long does ADU construction take in Pomona?
Construction & Building Pomona, CA
1 answers Oct 22, 2025
What foundation is required for ADUs in Glendale?
Construction & Building Glendale, CA
1 answers Oct 22, 2025
Best ADU contractors in Santa Clarita?
Construction & Building Santa Clarita, CA
1 answers Oct 22, 2025

ADU Development Checklist for Sacramento, CA

Use this comprehensive checklist to ensure you don't miss important steps in your ADU development process.

Planning Phase
  • Define project goals and budget
  • Research local zoning requirements
  • Evaluate site conditions and constraints
  • Consult with ADU experts
  • Develop preliminary design concepts
Pre-Construction
  • Finalize architectural plans
  • Submit permit applications
  • Select qualified contractors
  • Secure financing if needed
  • Schedule utility connections
Construction Phase
  • Site preparation and excavation
  • Foundation and framing work
  • Rough-in electrical and plumbing
  • Insulation and drywall installation
  • Interior and exterior finishes
Completion
  • Final inspections and approvals
  • Certificate of occupancy
  • Utility meter installation
  • Final walkthrough and cleanup
  • Property insurance updates
Need Help with Your ADU Checklist?

Our experts can provide personalized guidance for each phase of your Sacramento ADU project, ensuring nothing falls through the cracks.

Get Expert Project Guidance
Get Expert Help

Stuck on your ADU project? Get personalized guidance from our experts.

Free 15-minute consultation available
Related Topics
Construction & Building Sacramento ADU Planning Permits
Sacramento, CA

This question is specific to Sacramento, CA

Local regulations may vary by jurisdiction. Always verify with your local planning department.